  Project Name Description Location Stone Used Year Categories
HK20-Overformnderit-Copenhagen-Denmark-Greenland Marble-after renovation-02
OVERFORMYNDERIET

The Ministry building adjacent to the Parliament was historically significant and needed to undergo restoration as the substrate was failing and the exterior façade was being held in place with surface fasteners. The goal was to maintain the Greenland marble on the exterior but replacing it with newly mined material was not an option as the quarry was closed in the 1920s.

The existing Greenland marble was removed from the exterior and shipped to Texas where it was fabricated into StoneLite® panels. Lightweight stone plugs were manufactured to insert into the holes created by the surface fasteners. Some corner panels required a fixed curved and were fabricated to a radius of 11’-1” and 7’-9”.

2018
Multi-Story
23-24-Newman-St.-London-UK-limestone-02
23-24 NEWMAN ST.

A multi-story exterior, column band, balcony fascias, and soffits project clad in 313 m2 of StoneLite® St. Hubert SLG and Texas Cordova Shellstone Limestone. The project scope was a retrofit and conversion of a 1970’s unsightly office building  into 23 residential apartments with office accommodations on the ground floor.

The StoneLite® panels lightweight properties are a natural solution to architectural features where weight may be an issue.

The project won Best Housing (Large) in the AJ Retrofit Awards 2012 and a Blue Ribbon Award for Best Apartment.

2011
Multi-Story
81-Black-Prince-Rd.-London-UK-limestone-granite-01
81 Black Prince Rd.

Parliament House at 81 Black Prince Rd. is situated in the Albert Embankment with stunning vistas of the River Thames, Houses of Parliament and London Eye. The 23 story shared ownership residential tower was designed by award winning architect Keith Williams Architects and replaces a disused sixties office block. More than 3,250 m2 of StoneLite® St. Hubert SLG limestone and Impala Black honed and brushed granite was installed.

Telford Homes is the developer.

2014
Multi-Story
Merrion-Centre-Leeds-England-UK-limestone-05
MERRION CENTRE

Stone Panels, Inc. completed a renovation project by over cladding an existing office building with failing mosaic tile plus a two story roof extension.

The building was stripped back to its frame and reclad with 2,200 m² of StoneLite® Crossland Hills exterior sandstone panels. The project was completed without displacing tenants and the shopping center was able to operate without interruption.

In depth project details may be found on our blog Re-Cladding Projects with StoneLite®: Merrion Centre.

2008
Multi-Story
Fred-Olsen-Building-Oslo-Norway-granite-01
FRED OLSON BUILDING

A seven (7) story exterior reclad/renovation project completed in 2006 using StoneLite® Regal Gray granite.