Contact Us!

Our Projects in Transportation

View All Projects

  Project Name Description Location Stone Used Year Categories
JOHN WAYNE AIRPORT

StoneLite® Jura Beige and Jura Gold natural limestone panels were used to create this unusual 18′ diameter clock inside the John Wayne Airport.

2011
KALAMAZOO METRO TRANSIT

Kalamazoo Metro Transit expanded and renovated their administration office using StoneLite® Coffee Sandstone and Dakota Mahogany Granite panels. Almost 3,600 sq. ft. of reinforced natural stone was installed on the building’s exterior and interior lobby.

SPI manufactured curved soffit panels with curved returns installed at the North entry and Northeast elevation above the arched windows. Pattern cuts were required at the head and entry. The project included non 90 degree returns, more than 3300 linear inches of return edges, and curved finished returns.

Another benefit of choosing StoneLite® is the ability to install panels in all weather conditions.

2011
DALLAS LOVE FIELD

A terminal modernization project that used two panel module sizes of StoneLite® Leuders Limestone  for the interior terminal area and the entry vestibule.  Stone Panels, Inc. also performed the install of approximately 5,000 sq. ft. of StoneLite® natural stone panels.

2010
McCARRAN AIRPORT TERMINAL 3

Over 100,000 sq. ft. of StoneLite® Gascogne Beige Limestone was used in an exterior rain screen/open joint application and interior sealed joint application.  The interior beam panels are architecturally designed and custom fabricated to various angles and are a complicated feature.

2010
Multi-Story
U.S. AIR BUILDING

A two story commercial office property completed in 1988 using StoneLite® Impala Black Granite reinforced natural stone panels.  The project photos were taking in 2009 attesting to StoneLite®‘s performance and durability.

1988
Multi-Story