Contact Us






    UNIVERSITY OF CALIFORNIA SAN DIEGO RADY SCHOOL OF MANAGEMENT

    About the project

    UCSD were thrilled with the look and performance of StoneLite® Indiana Standard Buff  limestone panels installed on Otterson Hall.  UCSD chose to have StoneLite® panels as part of their Phase II construction by installing more than 16,500 sq. ft. StoneLite® natural Indiana Standard Buff limestone with a raked (vertical saw-tooth) finish.

    The  panels were installed over steel stud framing, sheathing and exterior insulation.

     

    Contact Information

    300 California St. #600
    San FranciscoCA 94104
    Phone: (415) 796-8100
    Project Details
    Street Address 10045 Scholars Drive North
    Year 2012
    Stone UsedIndiana Standard Buff Limestone Tooled Finish
    LocationLa Jolla California
    CategoriesEducation Exterior Multi-Story New Construction University