Crest Cadillac participated in the Cadillac Brand Image program including the installation of new exterior facade. More than 3,700 sq. ft. of StoneLite® limestone panels are installed using our narrow interlocking channel system.

Typical panel sizes were designed with a 24″x16″ module size. SPI value engineered the project and produced panels 48’x16″ with a vertical false joint to reduce the number of panels to manufacture and install. The project scope has 3/8″ sealed joints and a running bond installation.

Architect:  SOL-ARCH